Loading...
Economical 2017-10-11T13:42:03+00:00

HIGH
EARLY STRENGTH

In 6-12 hours UHM concrete reaches the same strength that normal strength OPC takes 28 days to achieve

At slightly elevated temperatures UHM geopolymer high/ultra high performance concrete can reach 80% of its 28-day strength in 24 hours

Set times can be adjusted according to specific application requirements

Faster: When cured at 85°C, UHM GUHPC can reach at least 75% of its 28-day strength in only 3 hours (19600 psi).

READY TO USE
SOONER

Faster setting and curing while maintaining excellent workability

Minimal training needed for field use

LIFE-CYCLE
SAVINGS

Inherent material characteristics–including high heat and corrosion resistance–assure superior durability throughout life cycle

Unique chemistry leads to longer service time

High resistance to environmental degradation leads to lower maintenance costs